Latest | 2023 | 2022 | 2021 | 2019 | 2018 | 2017 | 2016 | 2012 | 2011 | 2010 | 2009 | 2008 | 2007 | 2006
Stanton Cross is a brand new mixed-use development that is situated on the eastern edge of Wellingborough. As part of the towns £1 billion investment, a brand new Primary School to accomodated 420 pupils. In order to provide a high-quality educational provision, cabling infrastructure to support modern learning was required across the building. This all needed to be powered from the main comms room by servers housed in Connectix floor cabinets. A full range of technology was installed to achieve these objectives, including Cat 6a, B2ca cable, Cabinets, Panels, Cable Management and a total of 229 ports.